UAE-based company Masdar has installed solar panels on the rooftops of ADA University, including the buildings of the Italy-Azerbaijan University.
According to the company, the total capacity of the solar panels is 1.1 MW:
"All ADA University buildings, including the Italy-Azerbaijan University, are powered by a 1.1 MW solar rooftop installation developed by Masdar."
